Filling Solutions · Proven by Testing
05FACTORY / CERTIFICATES / PACKING

Certificates,
packing and shipping.

Documents you can check before ordering, and photos of how the machine is packed and shipped after it is built.

01 / CERTIFICATES

Documents you can check.

This is the full CTT test report for the magnetic pump series — eight pages, applicant details masked. Click any page to open it full size.

REPORT CTT2308010370CN · 8 PAGES · APPLICANT DETAILS MASKED

02 / PACKING

How it leaves the workshop.

Moisture barrier, stretch film and a reinforced timber base, with shipping marks and the packing list matched to what is inside. Every step is photographed and sent to you before shipment.

STRETCH FILM PHOTO 01
01

STRETCH FILM

Machine wrapped in stretch film over a moisture barrier before the case is closed.

BASE / PALLET PHOTO 02
02

BASE / PALLET

Machine bolted down to the crate base on timber blocks, so it cannot shift in transit.

MARKS & LABELS PHOTO 03
03

MARKS & LABELS

Shipping marks, case labels and the packing list matching what is inside the case.

Loading photos and the packing list are sent before the container leaves. Customs documents follow the same list, so nothing is missing on arrival.

03 / BEFORE SHIPMENT

What you receive, in order.

01

Pre-shipment test

Function and leak test on the finished machine, with photos.

02

Packing photos

Case, wrapping, base and spare parts photographed before closing.

03

Loading & documents

Loading photos, packing list, invoice and shipping documents.

04

After arrival

Remote or on-site installation guidance, plus operator training material.

04 / NEXT STEP

Test first. Partner later.

Send your material and container requirements and request a real machine test video for your product.

MachProof machine test still VIDEOMP
↑